Skip to content

Designing places
that last.

Libraries, homes and public rooms across Northern Europe, drawn by hand and built to be used for a hundred years.

( Move across the drawing to see the blueprint )

Ink drawing of a Roman amphitheatre: four tiers of arches rise on the left, then the wall curves away and steps down into a long ruin

What I do

Architecture that holds its ground

From a bathing house for winter swimmers to a library for forty thousand neighbours, every project starts with the site, the light and the people who will use it. I lead each one myself, from the first sketch to the final handover.

01 / Architecture

New buildings from the first site visit to the last snag list: libraries, homes, workplaces and public rooms.

02 / Interiors

Rooms planned down to the joinery, the light switches and the way a door handle feels in your hand.

03 / Masterplanning

Streets, courtyards and neighbourhoods drawn around the walk between them, not around the car.

Selected work

The skyline so far

Every outline is a building I have designed. Hover one to read its story, click to walk inside, or filter the skyline by type and watch it rebuild.

Ink drawing of Kalkværket Library
Five storey white reading hall of Kalkværket Library, with galleries of bookshelves around a central atrium under a roof light

No. 01 / 09

Cultural

Kalkværket Library

Aarhus, Denmark2024

A white cube of a library, hollowed out into a five storey reading hall lit by a single roof light.

Area
6,400 m²
Status
Completed
View project

How a building gets built

From the first walk to the last brick

Stage 01 / 05

Site and brief

NSITE, 1:20028.0019.60±0.00+15.40
  1. 01

    Site and brief

    Every project starts on foot. I walk the site at different hours, map the sun, the wind and the neighbours, and write the brief together with you.

    2 to 4 weeks

  2. 02

    Concept and massing

    Simple volumes first. We test how the building sits on its plot, where the light comes in and how it meets the street, with cardboard models you can hold.

    4 to 8 weeks

  3. 03

    Structure

    Floors, columns and spans are fixed early with the engineers, so the structure becomes part of the architecture instead of something hidden behind it.

    6 to 10 weeks

  4. 04

    Facade and detail

    Materials are chosen for how they age. Brick, timber and lime are drawn down to the joint at 1:5, then tested on site as full size samples.

    8 to 16 weeks

  5. 05

    Built and handed over

    I stay on site through construction and handover, and come back a year later to see how the building is actually being used.

    On site to the end

A colleague walking past drawings pinned to the wall of the studioFig. 01
The studio, Islands BryggeCopenhagen

The studio

One architect, a small team and a long table covered in drawings.

I founded the studio in Copenhagen in 2008, after ten years drawing public buildings in Oslo and Rotterdam. Today we are seven architects and two model makers, working from a former print shop by the harbour.

I lead every project myself, from the first site visit to the final snag list. We take on four to six new commissions a year, so each one gets the time, and the drawings, it deserves.

  1. 01

    Light first

    Plans start with where the sun comes in, at every hour and in every season.

  2. 02

    Materials that age well

    Brick, timber, lime and stone, chosen to look better in thirty years than on opening day.

  3. 03

    Built with the people who use it

    Librarians, teachers, families and winter bathers sit at the drawing table from the first week.

Years of practice
18
Buildings completed
42
Cities
9
Design awards
11

In their words

01 / 03

What clients say

“Elias drew our library a hundred times before he drew it once. The building that opened is the one the whole neighbourhood had imagined, only better.”
Ingrid HolmDirector, Kalkværket Library
Edit with Modulify